The long-awaited Mobility Capabilities Study will call for just 180 C-17s, a level that Gen. Norton Schwartz, head of US Transportation Command, agrees with. Schwartz told reporters in Washington today that 222 C-17s is “more organic capability than is required” for the Air Force’s airlift fleet. Schwartz said the 222 level—strongly urged by his predecessor, retired Gen. John Handy and recently endorsed by the Senate—is not needed because TRANSCOM believes planned C-5 upgrades, in combination with robust outsourcing to airlines, will provide enough airlift capability. Schwartz acknowledged that it will take two years for USAF will know if the modernized and re-engined C-5 actually work as advertised. “There is some risk in this strategy,” he admitted. Success with the C-5 upgrade is the “key assumption” in the MCS, he said.
B-21 Temporary Shelters Could Also Shelter B-2s
March 5, 2021
The Air Force's experimental runway shelter for the new B-21 bomber is large enough to cover it or the B-2, and therefore reveals no information about the dimensions of the new aircraft. Two such shelters will be evaluated, but the maker of the second version hasn't been chosen, yet.