Lockheed Martin has delivered to Northrop Grumman a pointing and control assembly system for the second geosynchronous orbit satellite in the Space-Based Infrared System constellation, according to a company release. Northrop, which now can begin integrating the PCA into the GEO-2 payload, also is working on assembly of GEO-1. Lockheed expects Northrop to deliver GEO-1 in mid-2007, whereupon Lockheed will perform final assembly and checkout in preparation for launch in late 2008.
PACAF Boss Calls for E-7s to Replace Aging E-3 AWACS
Feb. 24, 2021
The head of Pacific Air Forces is calling for new aircraft in his theater to meet the need for air superiority, including a quick short-term replacement for aging airborne warning and control aircraft and, in the future, the service’s next generation fighter. PACAF boss Gen. Kenneth S. Wilsbach told reporters…